PGE, Ørsted, and Istrana have signed a lease agreement for the future T5 terminal at the Port of Gdańsk. This terminal will be used for storing, pre-assembling, and installing offshore wind turbine components for the Baltica 2 project. The lease runs from Q4 2026 to the end of 2028, covering 21.3 hectares. It includes specialized areas for heavy equipment and two loading stations for jack-up vessels.
The terminal will support the development of the Baltica 2 offshore wind farm, with a planned capacity of 1.5 GW by 2027. The location strengthens Poland's offshore wind energy supply chain, positioning the Port of Gdańsk for future projects.