"Property Watch": Step by step, Eurocentrum prepares for tenants
"Considering the difficulties in the market, and the supply available, we decided to complete one of the buildings, which was more reasonable than to build the whole (complex) at once, which was originally planned," said Cihat Kilic, board member of 8 Star. He added that the firm could start with the next phase when the first one is at least 80% leased. The construction of other blocks should take no longer than 12 months due to common parking facilities for 800 cars and the completed ground zero stage for all four office buildings. According to Alan Colquhoun, managing director of DTZ Polska property consultancy, building specifications include VAV air conditioning (modern air conditioning including ventilation), suspended ceilings and raised floors. Provided that quality materials are being used, it can be qualified as class A project, he said, indicating that it falls into the category of modern office building. "(It's) good edge of town location on a major radial route ... and technical specs appear good on paper," he said. Asking rent in Eurocentrum runs at $20 per square meter, plus an additional service charge at $4.50 per square meter.
Facts and figures Eurocentrum was designed by Boyout Architectural Co. and Plan Design Co., both Turkey-based. The developer company 8 Star comprises of several construction and developer firms from Turkey, including Yenigun Group of Companies, Usluel Energy Installations, Bogazici Investments as well as Can Group. Sabri Bekdas, developer of Reform Plaza and Reform Center on Warsaw's Aleje Jerozolimskie, holds a 20% stake in the venture following contribution of the land for Eurocentrum. Colquhoun said that the 8 Star may have been perceived as over-ambitious in the beginning because of initial plans to build all towers at once and an association with Reform Plaza and Reform Center - projects that face uncertain futures. "Now that it's phased and the deal struck with the hotel tower and that design specifications are clearly much better, I think the project is being perceived fairly positively," he added.
In brief: - Spain-based Zara, a clothing retail chain, signed a 1,800-square-meter lease agreement in Kraków Plaza, located on Aleja Pokoju in Kraków earlier in May. The 31,300-square-meter retail and entertainment center, developed by the Netherlands-based Plaza Centers, is currently 97% leased. - Colliers International, Canada's property consultancy, reported 12,500 square meters of transacted office space in the first four months of 2002, most of which were tenant representation deals. Major transactions included: Unilever (5,400 square meters), Avon (nine deals totaling 2,522 square meters), TGC (1,500 square meters), Raiffeisen (four deals of 1,005 square meters), Dupont (1,068 square meters), Sara Lee (600 square meters), Heinz (500 square meters). - Skandinavian's hotel chain operator Radisson SAS Hotel & Resorts completed its 162-room hotel on ulica Purkyniego in Wrocław's downtown in May. It's the second Radisson hotel in Poland, after the first one opened Szczecin 10 years ago. This year, the chain is also planning to open in Warsaw. Hotels in Kraków and Katowice are slated for completion in 2003.